All parts to be installed must be present on the intended floor.
All prices include connection and kit work, excluding connection materials, provided the connection points are in the right place. If a diamond drill needs to be used when drilling holes (up to 10mm), a surcharge will be charged depending on the number of drill holes. (this of course does not apply to regular ceramic tiles) voorw1.gif To install a steam cabin, the floor under the steam cabin and the back wall must be tiled throughout, therefore waterproof.
Power, water and drainage must be prepared in accordance with the connection diagram of the relevant steam cabin.