
Renovating your bathroom without breaking it is faster, cheaper and less inconvenient. Discover the possibilities of bathroom panels, overlacquer tiles and new sanitary options.
There are several ways to give your bathroom a new look without cutting away the existing tiles. Bathroom panels are glued or screwed over the tiles and are available in many designs. Tile over tiles is another option, where thin tiles are glued directly onto the existing layer.
A third option is a concrete look coating. This allows you to apply a waterproof layer over the existing tiles, which gives a sleek, modern look. Finally, you can opt for bathroom foil, the cheapest option.
Renovate a bathroom without breaking (per bathroom)
Renovating without breaking works best if the pipework is still in good condition and you are satisfied with the layout of your bathroom. If the pipes are outdated or you want to move plumbing fixtures, it is often wiser to break them anyway.
The condition of the existing tiles also plays a role. They must be firmly attached and flat. Loose or convex tiles do not form a good basis for a new layer on top.
| Service | From | To | Unit |
|---|---|---|---|
| Bathroom panels over tiles | €1500 | €4000 | total |
| Tiles over tiles | €30 | €60 | per m2 |
| Concrete look coating over tiles | €60 | €120 | per m2 |
| Bathroom foil on tiles | €20 | €40 | per m2 |
| Replace plumbing (without breaking) | €500 | €2000 | total |
Yes, on average you save 30 to 50 percent compared to a complete renovation. You save on demolition work, rubble removal and labor hours.
Bathroom panels and tiles over tiles last 15 to 20 years with normal use. A concrete look coating lasts an average of 10 to 15 years.
Technically yes, but a professional is recommended for a waterproof and neatly finished result. Accurate work is especially important around the shower and at connections.
Join Moving.nl and receive direct requests from households in your area. Free sign-up, only pay per job.